Thursday, November 1, 2012

Hurricane Sandy - Long Beach Island

We're getting a little tired of Hurricanes.

Hurricane Sandy hit Long Beach Island at 8PM Monday October 29th.

The Army Corp of Engineers had a beach/dune replenishment project completed for Harvey Cedars 3 years ago which initially gave us about 100 yards of sand between the oceanfront houses and the ocean.  Some of that had washed away over the past 2 years but without that sand, most of the north end of LBI would be doing demolition/reconstruction instead of just cleanup and landscaping mode.

Our house on the left
Our Front Yard
Sandy hit during a full moon and had 2 high tides to remove the entire beach and dune.  Waves were breaking over the dune, running down the street and in to the bay which was already at record flood tide levels.



So far, nobody is allowed back on the island but from initial photos, our house ended up with alot of sand everywhere and probably some water under the doors but it could have been much worse.  We are still in the boatyard and will go home earlier at Christmas to work on the damage stuff instead of cutting time out now. 

Hurricane Sandy seems to have been appropriately named.








East side of my Mom's house

The main road of the island







Here's a video taken just before the final high tide.  The waves are coming over the dune and down the street.  It's a little dark because it was taken with a phone

 Photos Courtesy of Terry Deakyne

These are not pictures of our house but are from houses in the area which show the damage that we potentially could have had:




Photos courtesy of Paul Rice

Wednesday, October 31, 2012

Halloween In Mexico.
Pirates came to visit.




Sunday night bonfire planned by "Three Hour Tour"

We also had a "weenie roast" and roasted marshmallows. Any excuse to have a get together.

Saturday, October 27, 2012

Date Night in Mexico

It is amazing how long things take to do here.  Work on a boat always takes twice as long as you plan but here in Mexico, with the hot sun and lack of proper equipment, it is probably triple.  Yesterday it took 4 hours to overhaul the traveler car.  I have been buffing the hulls.  It is taking 1 day per 1 side of 1 hull.  A 4 day project just to get her compounded and polished.

Usually boatyard drinking starts around 3PM but we bowed out from the Friday Happy Hour to go grocery shopping and go out to dinner. 

Sunday, October 21, 2012

We're back onboard Tortuguita

Spent our first day cleaning dirt and dust from everywhere.
Laced the trampolines back on and equalized the batteries after 5 months of non-use.
Went to town for groceries and a $2.50 haircut.

Today we start polishing stainless and buffing the hulls.
It gets hot mid-day so 4-5 hours of work is all we can do.

We're running A/C at night so sleeping has been great.
Cheers, Dave and Booker

Friday, October 19, 2012

Guaymas

We arrived at the boatyard in Guaymas yesterday.  We had to spend a day in Phoenix because of full flights, but our friends from Nicaragua, Clemens and Kerstin, who are driving across the US just happened to be passing through Phoenix so we got together for lunch and they headed off to see the Grand Canyon.
We were surprised that the boat was not a filthy mess.  Yes it was dirty but we never have returned to the boat after a prolonged absence to find it clean.
The temperature is cooling down to the mid-80's and there is a big migration of cruisers returning to their boats this week.  We had a nice get together last night with other boaters.
It's back to work today though.  Cheers.

Wednesday, October 3, 2012

We will be returning to Tortuguita around October 12th and hope to accomplish all out of water projects in 2 weeks. Will then head north in the Sea of Cortez. Will start updating the blog from Mexico. Cheers, Dave and Booker

Tuesday, March 27, 2012

Hauling out in Guaymas, Sonora, Mexico

You would think they would move the little boat
We have just been hauled out at Marina Guaymas, which isn't even a marina.  It is a dirt lot in an industrial area across the bay from the town of Guaymas.  The yard has a 50 ton Travelift and we weigh 17 tons but it is only 21 ft wide and we need 24 1/2 ft.  The deal is that there is a shrimp boat overhaul facility next door that has a 250 ton lift so they will haul us out and take us down the road to this yard.  All went well and Tortuguita is laid up for the summer.