|
That's a wide Travelift |
We are right on schedule. The 2 weeks in a berth were used efficiently, the sails have been removed, the engine oil changed, batteries watered, dinghy and engine cleaned and flushed, lines removed, sunshades made and installed, water tank welded and ready for installation, toilets and holding tanks prepped for storage, and on and on.
|
Dry Storage at the Gold Coast City Marina |
After haul out, the antifouling need to be scrubbed, tanks filled, boat washed, engines flushed with fresh water and preserved with antifreeze, and finally 'cleaned up'. This all takes about 4 days if no problems are encountered.
|
Still need to be scrubbed and cleaned |
No comments:
Post a Comment